The Gotthard Base Tunnel

The heart of the new railway link through the Alps

The tunnel of the records


Total length of tunnels

152 km

Maximum depth

2300 m

Excavated materials

28.2 m tons

Real cost

CHF 12 bn


After nearly twenty years of hard work, the world’s longest and deepest rail tunnel is finally ready: the Gotthard Base Tunnel has been officially opened on June 1, 2016 (scheduled trains are only running from the December 11, 2016). Trains are now able to reach peak speeds of up to 250 km/h along a 60 kilometer stretch of track right through the heart of the Alps.

  Two single track tunnels, both 57 kilometers long, running between Bodio (Ticino) and Erstfeld (Uri) are at the heart of the New Railway Link through the Alps (NRLA): the Swiss masterpiece of the century. This ingenious shortcut established a direct route that allows traffic to cross the Alps at very high speed, with minimal gradients and gentle curves.

Explore Ticino


This sun filled part of Switzerland can be enjoyed at its best in combination with an exciting train journey. On arrival at Bellinzona, the Italian language and the relaxed atmosphere just invite you to explore the delights of Ticino.

An experience to enjoy now!


Ticino is ready to warmly welcome you.

SPECIAL OFFERS

Let yourself be inspired


Come and enjoy this unique experience.